Prostate surgery for an enlarged prostate (TURP) in the East of England: waiting times

Transurethral resection of the prostate (TURP) is an operation to reduce the size of the prostate when it has grown too large and makes it hard to pee. A thin tube is passed up the urethra to remove part of the prostate, under general or spinal anaesthetic. It can help if you need to pee often, take a long time to pee or leak urine.

Hospital-level numbers for this operation are not published as open data. This page shows NHS waiting times for urology and waits for cystoscopy (a camera test of the bladder).

Hospitals in the East of England

12 trusts in the East of England with published figures. Sorted by name. This is not a ranking: read how to read this first.

Hospital-level numbers for this specific operation are not published as open data. We do not show a volume figure because the nearest published grouping is dominated by other procedures.

Prostate surgery for an enlarged prostate (TURP): trusts in the East of England
TrustTrust activity (context)Not published for this operationKey outcomeNo hospital-level outcome data publishedWaiting timeWhole trustPatient experienceCQC rating
Bedfordshire Hospitals NHS Foundation TrustWhole trust. Hospitals: Bedford Hospital, Luton and Dunstable HospitalNot publishedNo outcome data published for this operation
More measures
  • Summary Hospital-level Mortality Indicator (SHMI), whole trust: 0.93 (As expected) 2025-06 to 2026-05
  • C. difficile infections that started in hospital (whole trust, not adjusted for case mix): 66 cases, 16.9 per 100,000 bed-days FY2025-26
  • MRSA bloodstream infections that started in hospital (whole trust, not adjusted for case mix): 6 cases FY2025-26
13.5 weeksHalf of people waiting for urology had waited less than this. 61.8% waiting under 18 weeks (August 2026)27.4% of people waiting for a cystoscopy had waited 6 weeks or more (England 27.4%, August 2026)About the same as other trustsInpatients rated their overall experience 8.1 out of 10 (CQC Adult Inpatient Survey 2025, whole trust)Bedford Hospital: No Approved Rating (CQC report for Bedford Hospital)
Luton and Dunstable Hospital: Requires improvement (CQC report for Luton and Dunstable Hospital)
Cambridge University Hospitals NHS Foundation TrustWhole trust. Hospitals: Addenbrooke’s and the Rosie Hospitals, Princess of Wales HospitalNot publishedNo outcome data published for this operation
More measures
  • Summary Hospital-level Mortality Indicator (SHMI), whole trust: 0.99 (As expected) 2025-06 to 2026-05
  • C. difficile infections that started in hospital (whole trust, not adjusted for case mix): 95 cases, 26.1 per 100,000 bed-days FY2025-26
  • MRSA bloodstream infections that started in hospital (whole trust, not adjusted for case mix): 4 cases FY2025-26
11.3 weeksHalf of people waiting for urology had waited less than this. 68% waiting under 18 weeks (August 2026)19% of people waiting for a cystoscopy had waited 6 weeks or more (England 27.4%, August 2026)About the same as other trustsInpatients rated their overall experience 8.1 out of 10 (CQC Adult Inpatient Survey 2025, whole trust)Good (CQC report for Addenbrooke's and the Rosie Hospitals)
East and North Hertfordshire Teaching NHS TrustWhole trust. Hospitals: Hertford County Hospital, Lister Hospital, Queen Elizabeth II HospitalNot publishedNo outcome data published for this operation
More measures
  • Summary Hospital-level Mortality Indicator (SHMI), whole trust: 0.92 (As expected) 2025-06 to 2026-05
  • C. difficile infections that started in hospital (whole trust, not adjusted for case mix): 42 cases, 20.5 per 100,000 bed-days FY2025-26
  • MRSA bloodstream infections that started in hospital (whole trust, not adjusted for case mix): 3 cases FY2025-26
14 weeksHalf of people waiting for urology had waited less than this. 58.4% waiting under 18 weeks (August 2026)5.5% of people waiting for a cystoscopy had waited 6 weeks or more (England 27.4%, August 2026)Somewhat worse than expectedInpatients rated their overall experience 7.8 out of 10 (CQC Adult Inpatient Survey 2025, whole trust)Hertford County Hospital: Good (CQC report for Hertford County Hospital)
Lister Hospital: Requires improvement (CQC report for Lister Hospital)
Queen Elizabeth II Hospital: Requires improvement (CQC report for Queen Elizabeth II Hospital)
East Suffolk and North Essex NHS Foundation TrustWhole trust. Hospitals: Colchester General Hospital, The Ipswich HospitalNot publishedNo outcome data published for this operation
More measures
  • Summary Hospital-level Mortality Indicator (SHMI), whole trust: 1.16 (As expected) 2025-06 to 2026-05
  • C. difficile infections that started in hospital (whole trust, not adjusted for case mix): 116 cases, 26.3 per 100,000 bed-days FY2025-26
  • MRSA bloodstream infections that started in hospital (whole trust, not adjusted for case mix): 6 cases FY2025-26
14.3 weeksHalf of people waiting for urology had waited less than this. 58.7% waiting under 18 weeks (August 2026)17.6% of people waiting for a cystoscopy had waited 6 weeks or more (England 27.4%, August 2026)About the same as other trustsInpatients rated their overall experience 7.9 out of 10 (CQC Adult Inpatient Survey 2025, whole trust)Colchester General Hospital: Requires improvement (CQC report for Colchester General Hospital)
The Ipswich Hospital: Requires improvement (CQC report for The Ipswich Hospital)
James Paget University Hospitals NHS Foundation TrustWhole trust. Hospitals: James Paget HospitalNot publishedNo outcome data published for this operation
More measures
  • Summary Hospital-level Mortality Indicator (SHMI), whole trust: 1.22 (Higher than expected) 2025-06 to 2026-05
  • C. difficile infections that started in hospital (whole trust, not adjusted for case mix): 22 cases, 16.5 per 100,000 bed-days FY2025-26
  • MRSA bloodstream infections that started in hospital (whole trust, not adjusted for case mix): 0 cases FY2025-26
15.6 weeksHalf of people waiting for urology had waited less than this. 56.2% waiting under 18 weeks (August 2026)62.5% of people waiting for a cystoscopy had waited 6 weeks or more (England 27.4%, August 2026)About the same as other trustsInpatients rated their overall experience 8.3 out of 10 (CQC Adult Inpatient Survey 2025, whole trust)Good (CQC report for James Paget Hospital)
Mid and South Essex NHS Foundation TrustWhole trust. Hospitals: Basildon University Hospital, Broomfield Hospital, Orsett Hospital, Southend University Hospital, St Peter’s HospitalNot publishedNo outcome data published for this operation
More measures
  • Summary Hospital-level Mortality Indicator (SHMI), whole trust: 1.13 (As expected) 2025-06 to 2026-05
  • C. difficile infections that started in hospital (whole trust, not adjusted for case mix): 109 cases, 17.2 per 100,000 bed-days FY2025-26
  • MRSA bloodstream infections that started in hospital (whole trust, not adjusted for case mix): 4 cases FY2025-26
16.6 weeksHalf of people waiting for urology had waited less than this. 53.2% waiting under 18 weeks (August 2026)59.9% of people waiting for a cystoscopy had waited 6 weeks or more (England 27.4%, August 2026)About the same as other trustsInpatients rated their overall experience 7.9 out of 10 (CQC Adult Inpatient Survey 2025, whole trust)Basildon University Hospital: Inadequate (CQC report for Basildon University Hospital)
Broomfield Hospital: Requires improvement (CQC report for Broomfield Hospital)
Southend University Hospital: Requires improvement (CQC report for Southend University Hospital)
Norfolk and Norwich University Hospitals NHS Foundation TrustWhole trust. Hospitals: Norfolk and Norwich University HospitalNot publishedNo outcome data published for this operation
More measures
  • Summary Hospital-level Mortality Indicator (SHMI), whole trust: 1.17 (Higher than expected) 2025-06 to 2026-05
  • C. difficile infections that started in hospital (whole trust, not adjusted for case mix): 62 cases, 18.4 per 100,000 bed-days FY2025-26
  • MRSA bloodstream infections that started in hospital (whole trust, not adjusted for case mix): 2 cases FY2025-26
14.7 weeksHalf of people waiting for urology had waited less than this. 58.3% waiting under 18 weeks (August 2026)58% of people waiting for a cystoscopy had waited 6 weeks or more (England 27.4%, August 2026)About the same as other trustsInpatients rated their overall experience 8.2 out of 10 (CQC Adult Inpatient Survey 2025, whole trust)Requires improvement (CQC report for Norfolk and Norwich University Hospital)
North West Anglia NHS Foundation TrustWhole trust. Hospitals: Hinchingbrooke Hospital, Peterborough City HospitalNot publishedNo outcome data published for this operation
More measures
  • Summary Hospital-level Mortality Indicator (SHMI), whole trust: 1.04 (As expected) 2025-06 to 2026-05
  • C. difficile infections that started in hospital (whole trust, not adjusted for case mix): 98 cases, 30.1 per 100,000 bed-days FY2025-26
  • MRSA bloodstream infections that started in hospital (whole trust, not adjusted for case mix): 2 cases FY2025-26
11.3 weeksHalf of people waiting for urology had waited less than this. 67.6% waiting under 18 weeks (August 2026)11.6% of people waiting for a cystoscopy had waited 6 weeks or more (England 27.4%, August 2026)Somewhat worse than expectedInpatients rated their overall experience 7.8 out of 10 (CQC Adult Inpatient Survey 2025, whole trust)Hinchingbrooke Hospital: Requires improvement (CQC report for Hinchingbrooke Hospital)
Peterborough City Hospital: Requires improvement (CQC report for Peterborough City Hospital)
The Princess Alexandra Hospital NHS TrustWhole trust. Hospitals: The Princess Alexandra HospitalNot publishedNo outcome data published for this operation
More measures
  • Summary Hospital-level Mortality Indicator (SHMI), whole trust: 1.02 (As expected) 2025-06 to 2026-05
  • C. difficile infections that started in hospital (whole trust, not adjusted for case mix): 38 cases, 22.7 per 100,000 bed-days FY2025-26
  • MRSA bloodstream infections that started in hospital (whole trust, not adjusted for case mix): 1 case FY2025-26
12.3 weeksHalf of people waiting for urology had waited less than this. 65.6% waiting under 18 weeks (August 2026)46.1% of people waiting for a cystoscopy had waited 6 weeks or more (England 27.4%, August 2026)Worse than expectedInpatients rated their overall experience 7.7 out of 10 (CQC Adult Inpatient Survey 2025, whole trust)Requires improvement (CQC report for The Princess Alexandra Hospital)
The Queen Elizabeth Hospital King's Lynn NHS Foundation TrustWhole trust. Hospitals: The Queen Elizabeth HospitalNot publishedNo outcome data published for this operation
More measures
  • Summary Hospital-level Mortality Indicator (SHMI), whole trust: 1.13 (As expected) 2025-06 to 2026-05
  • C. difficile infections that started in hospital (whole trust, not adjusted for case mix): 31 cases, 17.3 per 100,000 bed-days FY2025-26
  • MRSA bloodstream infections that started in hospital (whole trust, not adjusted for case mix): 0 cases FY2025-26
11.5 weeksHalf of people waiting for urology had waited less than this. 68.4% waiting under 18 weeks (August 2026)40.6% of people waiting for a cystoscopy had waited 6 weeks or more (England 27.4%, August 2026)About the same as other trustsInpatients rated their overall experience 7.8 out of 10 (CQC Adult Inpatient Survey 2025, whole trust)Requires improvement (CQC report for The Queen Elizabeth Hospital)
West Hertfordshire Teaching Hospitals NHS TrustWhole trust. Hospitals: Hemel Hempstead General Hospital, St Albans City Hospital, Watford General HospitalNot publishedNo outcome data published for this operation
More measures
  • Summary Hospital-level Mortality Indicator (SHMI), whole trust: 0.97 (As expected) 2025-06 to 2026-05
  • C. difficile infections that started in hospital (whole trust, not adjusted for case mix): 32 cases, 15.8 per 100,000 bed-days FY2025-26
  • MRSA bloodstream infections that started in hospital (whole trust, not adjusted for case mix): 0 cases FY2025-26
11.1 weeksHalf of people waiting for urology had waited less than this. 73.5% waiting under 18 weeks (August 2026)44.6% of people waiting for a cystoscopy had waited 6 weeks or more (England 27.4%, August 2026)Somewhat worse than expectedInpatients rated their overall experience 7.8 out of 10 (CQC Adult Inpatient Survey 2025, whole trust)Hemel Hempstead General Hospital: Requires improvement (CQC report for Hemel Hempstead General Hospital)
St Albans City Hospital: Requires improvement (CQC report for St Albans City Hospital)
Watford General Hospital: Requires improvement (CQC report for Watford General Hospital)
West Suffolk NHS Foundation TrustWhole trust. Hospitals: Newmarket Hospital, West Suffolk HospitalNot publishedNo outcome data published for this operation
More measures
  • Summary Hospital-level Mortality Indicator (SHMI), whole trust: 0.98 (As expected) 2025-06 to 2026-05
  • C. difficile infections that started in hospital (whole trust, not adjusted for case mix): 56 cases, 35.6 per 100,000 bed-days FY2025-26
  • MRSA bloodstream infections that started in hospital (whole trust, not adjusted for case mix): 1 case FY2025-26
11.9 weeksHalf of people waiting for urology had waited less than this. 64.2% waiting under 18 weeks (August 2026)12.8% of people waiting for a cystoscopy had waited 6 weeks or more (England 27.4%, August 2026)About the same as other trustsInpatients rated their overall experience 8.1 out of 10 (CQC Adult Inpatient Survey 2025, whole trust)Newmarket Hospital: Good (CQC report for Newmarket Hospital)
West Suffolk Hospital: Requires improvement (CQC report for West Suffolk Hospital)

Across England

In 2025-26, NHS-funded care in England (NHS hospitals and NHS patients treated by independent providers; private patients are not included) recorded 25,287 episodes where the main procedure was endoscopic resection of the outlet of the male bladder, including TURP (OPCS-4 M65). 24% were day cases. Half of the people admitted from a waiting list had waited less than about 111 days from the decision to admit them. These are national figures from Hospital Episode Statistics (NHS England, 2025-26, Open Government Licence v3.0); the same detail is not published for each hospital.

How to read this

  • Not a ranking. The table is in alphabetical order. A higher volume does not on its own mean better care, and we do not combine the columns into a score.
  • Risk adjustment. Where a figure says “adjusted”, the audit has allowed for differences in the patients each hospital treats, such as age and other illnesses. Hospitals that take on more complex cases can still look different for reasons the adjustment does not capture.
  • Bands and limits. We only say a result is higher or lower than expected when the source itself says so (for example NJR outlier status, NELA funnel limits, SSNAP levels, CQC survey bands). Where the source publishes a rate without limits we show the rate and the national figure, and say “No banding published”.
  • Small numbers. A small hospital can have 0% or a high percentage by chance. Figures the source suppresses are shown as “Not published (small numbers)”.
  • Trust or hospital. This audit publishes figures for each NHS trust, which may run several hospitals. The operation may only be done at one of them.
  • Different periods. Each figure has its own period, shown next to it. Audit results describe operations done one to three years ago; waiting times are updated monthly.
  • Talk to your GP or consultant about what the figures mean for you. If you are referred for planned care in England, you can usually choose your hospital.

Full definitions: methodology and data dictionary.

Data sources and licences

Data last updated 26 October 2026. We do not change the published figures; we only group volumes into bands. Spotted a mistake? Tell us.

Sources

We checked this guide against these official pages on 26 October 2026.

Spotted something out of date? Tell us.