Weight loss surgery in Yorkshire and the Humber: waiting times

Weight loss (bariatric) surgery is a treatment for people who are severely obese. The main types are gastric bypass, gastric band, gastric balloon and sleeve gastrectomy. To be considered on the NHS you will usually need a body mass index (BMI) of 40 or more and to have tried other ways of losing weight.

Most people go home 1 to 3 days after surgery. Hospital-level numbers for this operation are not published as open data, so this page shows NHS waiting times for general surgery and waits for gastroscopy.

Hospitals in Yorkshire and the Humber

14 trusts in Yorkshire and the Humber with published figures. Sorted by name. This is not a ranking: read how to read this first.

Hospital-level numbers for this specific operation are not published as open data. We do not show a volume figure because the nearest published grouping is dominated by other procedures.

Weight loss surgery: trusts in Yorkshire and the Humber
TrustTrust activity (context)Not published for this operationKey outcomeNo hospital-level outcome data publishedWaiting timeWhole trustPatient experienceCQC rating
Airedale NHS Foundation TrustWhole trust. Hospitals: Airedale General HospitalNot publishedNo outcome data published for this operation
More measures
  • Summary Hospital-level Mortality Indicator (SHMI), whole trust: 0.92 (As expected) 2025-06 to 2026-05
  • C. difficile infections that started in hospital (whole trust, not adjusted for case mix): 53 cases, 40.9 per 100,000 bed-days FY2025-26
  • MRSA bloodstream infections that started in hospital (whole trust, not adjusted for case mix): 1 case FY2025-26
7.5 weeksHalf of people waiting for general surgery had waited less than this. 78.2% waiting under 18 weeks (August 2026)15.9% of people waiting for a gastroscopy had waited 6 weeks or more (England 29.9%, August 2026)About the same as other trustsInpatients rated their overall experience 8.5 out of 10 (CQC Adult Inpatient Survey 2025, whole trust)Requires improvement (CQC report for Airedale General Hospital)
Barnsley Hospital NHS Foundation TrustWhole trust. Hospitals: Barnsley HospitalNot publishedNo outcome data published for this operation
More measures
  • Summary Hospital-level Mortality Indicator (SHMI), whole trust: 0.98 (As expected) 2025-06 to 2026-05
  • C. difficile infections that started in hospital (whole trust, not adjusted for case mix): 35 cases, 21.3 per 100,000 bed-days FY2025-26
  • MRSA bloodstream infections that started in hospital (whole trust, not adjusted for case mix): 0 cases FY2025-26
9.8 weeksHalf of people waiting for general surgery had waited less than this. 68% waiting under 18 weeks (August 2026)2.1% of people waiting for a gastroscopy had waited 6 weeks or more (England 29.9%, August 2026)About the same as other trustsInpatients rated their overall experience 8.5 out of 10 (CQC Adult Inpatient Survey 2025, whole trust)Good (CQC report for Barnsley Hospital)
Bradford Teaching Hospitals NHS Foundation TrustWhole trust. Hospitals: Bradford Royal Infirmary, St Luke’s HospitalNot publishedNo outcome data published for this operation
More measures
  • Summary Hospital-level Mortality Indicator (SHMI), whole trust: 1.24 (Higher than expected) 2025-06 to 2026-05
  • C. difficile infections that started in hospital (whole trust, not adjusted for case mix): 34 cases, 14.7 per 100,000 bed-days FY2025-26
  • MRSA bloodstream infections that started in hospital (whole trust, not adjusted for case mix): 2 cases FY2025-26
14.6 weeksHalf of people waiting for general surgery had waited less than this. 57.4% waiting under 18 weeks (August 2026)19.7% of people waiting for a gastroscopy had waited 6 weeks or more (England 29.9%, August 2026)About the same as other trustsInpatients rated their overall experience 8.1 out of 10 (CQC Adult Inpatient Survey 2025, whole trust)Bradford Royal Infirmary: Good (CQC report for Bradford Royal Infirmary)
St Luke's Hospital: Good (CQC report for St Luke's Hospital)
Calderdale and Huddersfield NHS Foundation TrustWhole trust. Hospitals: Calderdale Royal Hospital, Huddersfield Royal InfirmaryNot publishedNo outcome data published for this operation
More measures
  • Summary Hospital-level Mortality Indicator (SHMI), whole trust: 1.18 (Higher than expected) 2025-06 to 2026-05
  • C. difficile infections that started in hospital (whole trust, not adjusted for case mix): 34 cases, 13.9 per 100,000 bed-days FY2025-26
  • MRSA bloodstream infections that started in hospital (whole trust, not adjusted for case mix): 2 cases FY2025-26
9.6 weeksHalf of people waiting for general surgery had waited less than this. 73.4% waiting under 18 weeks (August 2026)0.9% of people waiting for a gastroscopy had waited 6 weeks or more (England 29.9%, August 2026)About the same as other trustsInpatients rated their overall experience 8.3 out of 10 (CQC Adult Inpatient Survey 2025, whole trust)Calderdale Royal Hospital: Requires improvement (CQC report for Calderdale Royal Hospital)
Huddersfield Royal Infirmary: Good (CQC report for Huddersfield Royal Infirmary)
Doncaster and Bassetlaw Teaching Hospitals NHS Foundation TrustWhole trust. Hospitals: Doncaster Royal Infirmary, Montagu Hospital, MexboroughNot publishedNo outcome data published for this operation
More measures
  • Summary Hospital-level Mortality Indicator (SHMI), whole trust: 1.16 (As expected) 2025-06 to 2026-05
  • C. difficile infections that started in hospital (whole trust, not adjusted for case mix): 70 cases, 26.2 per 100,000 bed-days FY2025-26
  • MRSA bloodstream infections that started in hospital (whole trust, not adjusted for case mix): 3 cases FY2025-26
10.8 weeksHalf of people waiting for general surgery had waited less than this. 69.5% waiting under 18 weeks (August 2026)1.4% of people waiting for a gastroscopy had waited 6 weeks or more (England 29.9%, August 2026)About the same as other trustsInpatients rated their overall experience 8.4 out of 10 (CQC Adult Inpatient Survey 2025, whole trust)Doncaster Royal Infirmary: Requires improvement (CQC report for Doncaster Royal Infirmary)
Montagu Hospital, Mexborough: Requires improvement (CQC report for Montagu Hospital, Mexborough)
Harrogate and District NHS Foundation TrustWhole trust. Hospitals: Harrogate District HospitalNot publishedNo outcome data published for this operation
More measures
  • Summary Hospital-level Mortality Indicator (SHMI), whole trust: 1.01 (As expected) 2025-06 to 2026-05
  • C. difficile infections that started in hospital (whole trust, not adjusted for case mix): 26 cases, 25.7 per 100,000 bed-days FY2025-26
  • MRSA bloodstream infections that started in hospital (whole trust, not adjusted for case mix): 0 cases FY2025-26
10.5 weeksHalf of people waiting for general surgery had waited less than this. 71.4% waiting under 18 weeks (August 2026)6.7% of people waiting for a gastroscopy had waited 6 weeks or more (England 29.9%, August 2026)About the same as other trustsInpatients rated their overall experience 8.3 out of 10 (CQC Adult Inpatient Survey 2025, whole trust)Good (CQC report for Harrogate District Hospital)
Hull University Teaching Hospitals NHS TrustWhole trust. Hospitals: Castle Hill Hospital, Hull Royal InfirmaryNot publishedNo outcome data published for this operation
More measures
  • Summary Hospital-level Mortality Indicator (SHMI), whole trust: 1.06 (As expected) 2025-06 to 2026-05
  • C. difficile infections that started in hospital (whole trust, not adjusted for case mix): 81 cases, 20.5 per 100,000 bed-days FY2025-26
  • MRSA bloodstream infections that started in hospital (whole trust, not adjusted for case mix): 4 cases FY2025-26
14.6 weeksHalf of people waiting for general surgery had waited less than this. 57.6% waiting under 18 weeks (August 2026)54.9% of people waiting for a gastroscopy had waited 6 weeks or more (England 29.9%, August 2026)About the same as other trustsInpatients rated their overall experience 8.3 out of 10 (CQC Adult Inpatient Survey 2025, whole trust)Castle Hill Hospital: Requires improvement (CQC report for Castle Hill Hospital)
Hull Royal Infirmary: Requires improvement (CQC report for Hull Royal Infirmary)
Leeds Teaching Hospitals NHS TrustWhole trust. Hospitals: Chapel Allerton Hospital, Leeds General Infirmary, Seacroft Hospital, St James’s University Hospital, Wharfedale HospitalNot publishedNo outcome data published for this operation
More measures
  • Summary Hospital-level Mortality Indicator (SHMI), whole trust: 1.14 (As expected) 2025-06 to 2026-05
  • C. difficile infections that started in hospital (whole trust, not adjusted for case mix): 112 cases, 17.8 per 100,000 bed-days FY2025-26
  • MRSA bloodstream infections that started in hospital (whole trust, not adjusted for case mix): 10 cases, 1.6 per 100,000 bed-days FY2025-26
9.6 weeksHalf of people waiting for general surgery had waited less than this. 77.8% waiting under 18 weeks (August 2026)36.2% of people waiting for a gastroscopy had waited 6 weeks or more (England 29.9%, August 2026)About the same as other trustsInpatients rated their overall experience 8.2 out of 10 (CQC Adult Inpatient Survey 2025, whole trust)Chapel Allerton Hospital: Good (CQC report for Chapel Allerton Hospital)
Leeds General Infirmary: Requires improvement (CQC report for Leeds General Infirmary)
St James's University Hospital: Requires improvement (CQC report for St James's University Hospital)
Wharfedale Hospital: Good (CQC report for Wharfedale Hospital)
Mid Yorkshire Teaching NHS TrustWhole trust. Hospitals: Dewsbury and District Hospital, Pinderfields Hospital, Pontefract HospitalNot publishedNo outcome data published for this operation
More measures
  • Summary Hospital-level Mortality Indicator (SHMI), whole trust: 1.09 (As expected) 2025-06 to 2026-05
  • C. difficile infections that started in hospital (whole trust, not adjusted for case mix): 59 cases, 16.1 per 100,000 bed-days FY2025-26
  • MRSA bloodstream infections that started in hospital (whole trust, not adjusted for case mix): 4 cases FY2025-26
12.4 weeksHalf of people waiting for general surgery had waited less than this. 66.8% waiting under 18 weeks (August 2026)0.4% of people waiting for a gastroscopy had waited 6 weeks or more (England 29.9%, August 2026)About the same as other trustsInpatients rated their overall experience 8.1 out of 10 (CQC Adult Inpatient Survey 2025, whole trust)Dewsbury and District Hospital: Requires improvement (CQC report for Dewsbury and District Hospital)
Pinderfields Hospital: Requires improvement (CQC report for Pinderfields Hospital)
Pontefract Hospital: Requires improvement (CQC report for Pontefract Hospital)
Northern Lincolnshire and Goole NHS Foundation TrustWhole trust. Hospitals: Diana Princess of Wales Hospital, Goole & District Hospital, Scunthorpe General HospitalNot publishedNo outcome data published for this operation
More measures
  • Summary Hospital-level Mortality Indicator (SHMI), whole trust: 1.00 (As expected) 2025-06 to 2026-05
  • C. difficile infections that started in hospital (whole trust, not adjusted for case mix): 24 cases, 12.6 per 100,000 bed-days FY2025-26
  • MRSA bloodstream infections that started in hospital (whole trust, not adjusted for case mix): 2 cases FY2025-26
13.9 weeksHalf of people waiting for general surgery had waited less than this. 59.7% waiting under 18 weeks (August 2026)62.9% of people waiting for a gastroscopy had waited 6 weeks or more (England 29.9%, August 2026)About the same as other trustsInpatients rated their overall experience 8.3 out of 10 (CQC Adult Inpatient Survey 2025, whole trust)Diana Princess of Wales Hospital: Requires improvement (CQC report for Diana Princess of Wales Hospital)
Goole & District Hospital: Good (CQC report for Goole & District Hospital)
Scunthorpe General Hospital: Requires improvement (CQC report for Scunthorpe General Hospital)
The Rotherham NHS Foundation TrustWhole trust. Hospitals: Rotherham General HospitalNot publishedNo outcome data published for this operation
More measures
  • Summary Hospital-level Mortality Indicator (SHMI), whole trust: 1.16 (As expected) 2025-06 to 2026-05
  • C. difficile infections that started in hospital (whole trust, not adjusted for case mix): 41 cases, 25.7 per 100,000 bed-days FY2025-26
  • MRSA bloodstream infections that started in hospital (whole trust, not adjusted for case mix): 0 cases FY2025-26
13.9 weeksHalf of people waiting for general surgery had waited less than this. 57.3% waiting under 18 weeks (August 2026)3.4% of people waiting for a gastroscopy had waited 6 weeks or more (England 29.9%, August 2026)About the same as other trustsInpatients rated their overall experience 8.1 out of 10 (CQC Adult Inpatient Survey 2025, whole trust)Requires improvement (CQC report for Rotherham General Hospital)
Sheffield Children's NHS Foundation TrustWhole trust. Hospitals: Sheffield Children’s HospitalNot publishedNo outcome data published for this operation
More measures
  • C. difficile infections that started in hospital (whole trust, not adjusted for case mix): 5 cases FY2025-26
  • MRSA bloodstream infections that started in hospital (whole trust, not adjusted for case mix): 0 cases FY2025-26
40.3% of people waiting for a gastroscopy had waited 6 weeks or more (England 29.9%, August 2026)Not publishedNot Rated (CQC report for Sheffield Children's Hospital)
South Tees Hospitals NHS Foundation TrustWhole trust. Hospitals: Friarage Hospital, Friary HospitalNot publishedNo outcome data published for this operation
More measures
  • Summary Hospital-level Mortality Indicator (SHMI), whole trust: 1.02 (As expected) 2025-06 to 2026-05
  • C. difficile infections that started in hospital (whole trust, not adjusted for case mix): 92 cases, 29.3 per 100,000 bed-days FY2025-26
  • MRSA bloodstream infections that started in hospital (whole trust, not adjusted for case mix): 6 cases FY2025-26
12.5 weeksHalf of people waiting for general surgery had waited less than this. 65.3% waiting under 18 weeks (August 2026)11.9% of people waiting for a gastroscopy had waited 6 weeks or more (England 29.9%, August 2026)About the same as other trustsInpatients rated their overall experience 8.4 out of 10 (CQC Adult Inpatient Survey 2025, whole trust)Good (CQC report for Friarage Hospital)
York and Scarborough Teaching Hospitals NHS Foundation TrustWhole trust. Hospitals: Bridlington Hospital, Scarborough Hospital, The York HospitalNot publishedNo outcome data published for this operation
More measures
  • Summary Hospital-level Mortality Indicator (SHMI), whole trust: 0.90 (As expected) 2025-06 to 2026-05
  • C. difficile infections that started in hospital (whole trust, not adjusted for case mix): 83 cases, 27.3 per 100,000 bed-days FY2025-26
  • MRSA bloodstream infections that started in hospital (whole trust, not adjusted for case mix): 5 cases FY2025-26
13.4% of people waiting for a gastroscopy had waited 6 weeks or more (England 29.9%, August 2026)About the same as other trustsInpatients rated their overall experience 8.1 out of 10 (CQC Adult Inpatient Survey 2025, whole trust)Bridlington Hospital: Good (CQC report for Bridlington Hospital)
Scarborough Hospital: Good (CQC report for Scarborough Hospital)
The York Hospital: Requires improvement (CQC report for The York Hospital)

How to read this

  • Not a ranking. The table is in alphabetical order. A higher volume does not on its own mean better care, and we do not combine the columns into a score.
  • Risk adjustment. Where a figure says “adjusted”, the audit has allowed for differences in the patients each hospital treats, such as age and other illnesses. Hospitals that take on more complex cases can still look different for reasons the adjustment does not capture.
  • Bands and limits. We only say a result is higher or lower than expected when the source itself says so (for example NJR outlier status, NELA funnel limits, SSNAP levels, CQC survey bands). Where the source publishes a rate without limits we show the rate and the national figure, and say “No banding published”.
  • Small numbers. A small hospital can have 0% or a high percentage by chance. Figures the source suppresses are shown as “Not published (small numbers)”.
  • Trust or hospital. This audit publishes figures for each NHS trust, which may run several hospitals. The operation may only be done at one of them.
  • Different periods. Each figure has its own period, shown next to it. Audit results describe operations done one to three years ago; waiting times are updated monthly.
  • Talk to your GP or consultant about what the figures mean for you. If you are referred for planned care in England, you can usually choose your hospital.

Full definitions: methodology and data dictionary.

Data sources and licences

Data last updated 26 October 2026. We do not change the published figures; we only group volumes into bands. Spotted a mistake? Tell us.

Sources

We checked this guide against these official pages on 26 October 2026.

Spotted something out of date? Tell us.