A hip replacement replaces damaged parts of the hip joint with metal, plastic or ceramic parts. It is most often done for pain and stiffness caused by osteoarthritis, when other treatments have not helped and the hip is affecting daily life. Recovery takes several months, and a new hip can last at least 15 years.
Every hip and knee replacement in England, NHS or private, is recorded in the National Joint Registry (NJR). The NJR checks each hospital's results against what would be expected for its patients, and publishes whether a hospital is an outlier. That lets this page include private hospitals as well as NHS ones.
Hospitals in the South East
67 hospitals in the South East with published figures. Sorted by name. This is not a ranking: read how to read this first.
The NJR open data gives one total per hospital for all joint replacements (hips, knees, ankles, elbows and shoulders) together. It does not split hips from knees.
| Hospital | Volume bandJoint replacements, all joints, 2025 (NJR) | Key outcomeNJR outlier status | Waiting timeWhole trust | Patient experience | CQC rating |
|---|---|---|---|---|---|
| Ashford HospitalNHS · Ashford and St. Peter's Hospitals NHS Foundation Trust | 750 to 999857 joint replacements of all kinds recorded in 2025Earlier years: 2023: 714, 2024: 662 | Not identified as an outlierMore measures
| 12.6 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 66.5% waiting under 18 weeks (August 2026) | About the same as other trustsInpatients rated their overall experience 8.2 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | Requires improvement (CQC report for Ashford Hospital) |
| Ashtead HospitalPrivate hospitalPrivate hospital: NJR figures include privately funded and NHS-funded operations. | Fewer than 400342 joint replacements of all kinds recorded in 2025Earlier years: 2023: 226, 2024: 255 | Not identified as an outlierEach NJR measure
| Not published for private hospitals | Not covered by NHS patient surveys | Good (CQC report for Ashtead Hospital) |
| Basingstoke and North Hampshire HospitalNHS · Hampshire Hospitals NHS Foundation Trust | 750 to 999810 joint replacements of all kinds recorded in 2025Earlier years: 2023: 578, 2024: 749 | Not identified as an outlierMore measures
| 14.2 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 60.7% waiting under 18 weeks (August 2026) | About the same as other trustsInpatients rated their overall experience 8.3 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | Good (CQC report for Basingstoke and North Hampshire Hospital) |
| The Berkshire Independent HospitalPrivate hospitalPrivate hospital: NJR figures include privately funded and NHS-funded operations. | Fewer than 400373 joint replacements of all kinds recorded in 2025Earlier years: 2023: 294, 2024: 386 | Not identified as an outlierEach NJR measure
| Not published for private hospitals | Not covered by NHS patient surveys | Good (CQC report for The Berkshire Independent Hospital) |
| Chaucer HospitalPrivate hospitalPrivate hospital: NJR figures include privately funded and NHS-funded operations. | 750 to 999893 joint replacements of all kinds recorded in 2025Earlier years: 2023: 604, 2024: 831 | Not identified as an outlierEach NJR measure
| Not published for private hospitals | Not covered by NHS patient surveys | Good (CQC report for Chaucer Hospital) |
| The Cherwell HospitalPrivate hospitalPrivate hospital: NJR figures include privately funded and NHS-funded operations. | 1,000 or more1,559 joint replacements of all kinds recorded in 2025Earlier years: 2023: 1,270, 2024: 1,403 | Not identified as an outlierEach NJR measure
| Not published for private hospitals | Not covered by NHS patient surveys | Good (CQC report for The Cherwell Hospital) |
| The Chiltern HospitalPrivate hospitalPrivate hospital: NJR figures include privately funded and NHS-funded operations. | 1,000 or more1,427 joint replacements of all kinds recorded in 2025Earlier years: 2023: 1,216, 2024: 1,271 | Not identified as an outlierEach NJR measure
| Not published for private hospitals | Not covered by NHS patient surveys | Good (CQC report for The Chiltern Hospital) |
| Conquest HospitalNHS · East Sussex Healthcare NHS Trust | 1,000 or more1,276 joint replacements of all kinds recorded in 2025Earlier years: 2023: 870, 2024: 1,348 | Not identified as an outlierMore measures
| 9.5 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 78% waiting under 18 weeks (August 2026) | About the same as other trustsInpatients rated their overall experience 8.3 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | Outstanding (CQC report for Conquest Hospital) |
| Darent Valley HospitalNHS · Dartford and Gravesham NHS Trust | 400 to 749618 joint replacements of all kinds recorded in 2025Earlier years: 2023: 375, 2024: 387 | Not identified as an outlierMore measures
| 17.7 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 50.8% waiting under 18 weeks (August 2026) | Worse than expectedInpatients rated their overall experience 7.7 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | Good (CQC report for Darent Valley Hospital) |
| East Surrey HospitalNHS · Surrey and Sussex Healthcare NHS Trust | 750 to 999808 joint replacements of all kinds recorded in 2025Earlier years: 2023: 523, 2024: 665 | Not identified as an outlierMore measures
| 17 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 52.7% waiting under 18 weeks (August 2026) | About the same as other trustsInpatients rated their overall experience 8.2 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | Requires improvement (CQC report for East Surrey Hospital) |
| Eastbourne District General HospitalNHS · East Sussex Healthcare NHS Trust | Fewer than 40038 joint replacements of all kinds recorded in 2025Earlier years: 2023: 198, 2024: 100 | Not identified as an outlierMore measures
| 9.5 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 78% waiting under 18 weeks (August 2026) | About the same as other trustsInpatients rated their overall experience 8.3 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | Good (CQC report for Eastbourne District General Hospital) |
| Epsom General HospitalNHS · Epsom and St Helier University Hospitals NHS Trust | Not published (small numbers) | No outcome data published for this operationMore measures
| 13.4 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 61.9% waiting under 18 weeks (August 2026) | About the same as other trustsInpatients rated their overall experience 7.9 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | Good (CQC report for Epsom General Hospital) |
| Fordcombe HospitalNHS · Maidstone and Tunbridge Wells NHS Trust | Fewer than 400141 joint replacements of all kinds recorded in 2025Earlier years: 2024: 29 | Not identified as an outlierMore measures
| 10.8 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 75.6% waiting under 18 weeks (August 2026) | About the same as other trustsInpatients rated their overall experience 8.1 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | Good (CQC report for Fordcombe Hospital) |
| Frimley Park HospitalNHS · Frimley Health NHS Foundation Trust | 400 to 749599 joint replacements of all kinds recorded in 2025Earlier years: 2023: 541, 2024: 543 | Not identified as an outlierMore measures
| 16.4 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 53.7% waiting under 18 weeks (August 2026) | About the same as other trustsInpatients rated their overall experience 8.3 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | Good (CQC report for Frimley Park Hospital) |
| Goring Hall HospitalPrivate hospitalPrivate hospital: NJR figures include privately funded and NHS-funded operations. | 1,000 or more1,033 joint replacements of all kinds recorded in 2025Earlier years: 2023: 1,038, 2024: 989 | Not identified as an outlierEach NJR measure
| Not published for private hospitals | Not covered by NHS patient surveys | Good (CQC report for Goring Hall Hospital) |
| The Hampshire ClinicPrivate hospitalPrivate hospital: NJR figures include privately funded and NHS-funded operations. | 750 to 999766 joint replacements of all kinds recorded in 2025Earlier years: 2023: 548, 2024: 637 | Not identified as an outlierEach NJR measure
| Not published for private hospitals | Not covered by NHS patient surveys | Good (CQC report for The Hampshire Clinic) |
| Heatherwood HospitalNHS · Frimley Health NHS Foundation Trust | 1,000 or more1,770 joint replacements of all kinds recorded in 2025Earlier years: 2023: 1,829, 2024: 1,740 | Not identified as an outlierMore measures
| 16.4 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 53.7% waiting under 18 weeks (August 2026) | About the same as other trustsInpatients rated their overall experience 8.3 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | No rating |
| The Horder CentrePrivate hospitalPrivate hospital: NJR figures include privately funded and NHS-funded operations. | 1,000 or more2,451 joint replacements of all kinds recorded in 2025Earlier years: 2023: 2,519, 2024: 2,661 | Not identified as an outlierEach NJR measure
| Not published for private hospitals | Not covered by NHS patient surveys | Outstanding (CQC report for The Horder Centre) |
| Horton General HospitalNHS · Oxford University Hospitals NHS Foundation Trust | Fewer than 400230 joint replacements of all kinds recorded in 2025Earlier years: 2023: 110, 2024: 221 | Not identified as an outlierMore measures
| 15.1 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 57.4% waiting under 18 weeks (August 2026) | About the same as other trustsInpatients rated their overall experience 8.2 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | Good (CQC report for Horton General Hospital) |
| John Radcliffe HospitalNHS · Oxford University Hospitals NHS Foundation Trust | Fewer than 400206 joint replacements of all kinds recorded in 2025Earlier years: 2023: 163, 2024: 201 | Not identified as an outlierMore measures
| 15.1 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 57.4% waiting under 18 weeks (August 2026) | About the same as other trustsInpatients rated their overall experience 8.2 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | Requires improvement (CQC report for John Radcliffe Hospital) |
| Kent & Canterbury HospitalNHS · East Kent Hospitals University NHS Foundation Trust | 1,000 or more1,238 joint replacements of all kinds recorded in 2025Earlier years: 2023: 952, 2024: 1,190 | Not identified as an outlierMore measures
| 20.7 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 44% waiting under 18 weeks (August 2026) | About the same as other trustsInpatients rated their overall experience 8.3 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | Requires improvement (CQC report for Kent & Canterbury Hospital) |
| KIMS HospitalPrivate hospitalPrivate hospital: NJR figures include privately funded and NHS-funded operations. | 1,000 or more1,632 joint replacements of all kinds recorded in 2025Earlier years: 2023: 1,662, 2024: 1,616 | Not identified as an outlierEach NJR measure
| Not published for private hospitals | Not covered by NHS patient surveys | Good (CQC report for KIMS Hospital) |
| Maidstone HospitalNHS · Maidstone and Tunbridge Wells NHS Trust | 1,000 or more1,616 joint replacements of all kinds recorded in 2025Earlier years: 2023: 660, 2024: 1,058 | Not identified as an outlierMore measures
| 10.8 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 75.6% waiting under 18 weeks (August 2026) | About the same as other trustsInpatients rated their overall experience 8.1 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | Requires improvement (CQC report for Maidstone Hospital) |
| Medway Maritime HospitalNHS · Medway NHS Foundation Trust | 750 to 999893 joint replacements of all kinds recorded in 2025Earlier years: 2023: 665, 2024: 922 | Not identified as an outlierMore measures
| 16.8 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 54.1% waiting under 18 weeks (August 2026) | About the same as other trustsInpatients rated their overall experience 7.8 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | Requires improvement (CQC report for Medway Maritime Hospital) |
| Milton Keynes HospitalNHS · Milton Keynes University Hospital NHS Foundation Trust | 400 to 749654 joint replacements of all kinds recorded in 2025Earlier years: 2023: 680, 2024: 769 | Identified as an outlier: hip 10-year revisionMore measures
| 15.5 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 56.7% waiting under 18 weeks (August 2026) | About the same as other trustsInpatients rated their overall experience 8 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | Good (CQC report for Milton Keynes Hospital) |
| Mount Alvernia HospitalPrivate hospitalPrivate hospital: NJR figures include privately funded and NHS-funded operations. | Fewer than 400313 joint replacements of all kinds recorded in 2025Earlier years: 2023: 430, 2024: 351 | Not identified as an outlierEach NJR measure
| Not published for private hospitals | Not covered by NHS patient surveys | Good (CQC report for Mount Alvernia Hospital) |
| The New Foscote HospitalPrivate hospitalPrivate hospital: NJR figures include privately funded and NHS-funded operations. | Fewer than 400383 joint replacements of all kinds recorded in 2025Earlier years: 2023: 135, 2024: 241 | Not identified as an outlierEach NJR measure
| Not published for private hospitals | Not covered by NHS patient surveys | Good (CQC report for The New Foscote Hospital) |
| North Downs HospitalPrivate hospitalPrivate hospital: NJR figures include privately funded and NHS-funded operations. | 400 to 749508 joint replacements of all kinds recorded in 2025Earlier years: 2023: 494, 2024: 468 | Not identified as an outlierEach NJR measure
| Not published for private hospitals | Not covered by NHS patient surveys | Good (CQC report for North Downs Hospital) |
| Nuffield Health Brighton HospitalPrivate hospitalPrivate hospital: NJR figures include privately funded and NHS-funded operations. | 400 to 749557 joint replacements of all kinds recorded in 2025Earlier years: 2023: 251, 2024: 427 | Not identified as an outlierEach NJR measure
| Not published for private hospitals | Not covered by NHS patient surveys | Good (CQC report for Nuffield Health Brighton Hospital) |
| Nuffield Health Chichester HospitalPrivate hospitalPrivate hospital: NJR figures include privately funded and NHS-funded operations. | 750 to 999988 joint replacements of all kinds recorded in 2025Earlier years: 2023: 638, 2024: 846 | Not identified as an outlierEach NJR measure
| Not published for private hospitals | Not covered by NHS patient surveys | Outstanding (CQC report for Nuffield Health Chichester Hospital) |
| Nuffield Health Guildford HospitalPrivate hospitalPrivate hospital: NJR figures include privately funded and NHS-funded operations. | Fewer than 400346 joint replacements of all kinds recorded in 2025Earlier years: 2023: 312, 2024: 365 | Not identified as an outlierEach NJR measure
| Not published for private hospitals | Not covered by NHS patient surveys | Good (CQC report for Nuffield Health Guildford Hospital) |
| Nuffield Health Haywards Heath HospitalPrivate hospitalPrivate hospital: NJR figures include privately funded and NHS-funded operations. | 400 to 749464 joint replacements of all kinds recorded in 2025Earlier years: 2023: 433, 2024: 477 | Not identified as an outlierEach NJR measure
| Not published for private hospitals | Not covered by NHS patient surveys | Good (CQC report for Nuffield Health Haywards Heath Hospital) |
| Nuffield Health The Manor Hospital OxfordPrivate hospitalPrivate hospital: NJR figures include privately funded and NHS-funded operations. | 750 to 999921 joint replacements of all kinds recorded in 2025Earlier years: 2023: 961, 2024: 893 | Not identified as an outlierEach NJR measure
| Not published for private hospitals | Not covered by NHS patient surveys | Good (CQC report for Nuffield Health The Manor Hospital Oxford) |
| Nuffield Health Tunbridge Wells HospitalPrivate hospitalPrivate hospital: NJR figures include privately funded and NHS-funded operations. | Fewer than 400346 joint replacements of all kinds recorded in 2025Earlier years: 2023: 384, 2024: 447 | Not identified as an outlierEach NJR measure
| Not published for private hospitals | Not covered by NHS patient surveys | Good (CQC report for Nuffield Health Tunbridge Wells Hospital) |
| Nuffield Health Wessex HospitalPrivate hospitalPrivate hospital: NJR figures include privately funded and NHS-funded operations. | 750 to 999977 joint replacements of all kinds recorded in 2025Earlier years: 2023: 927, 2024: 1,008 | Not identified as an outlierEach NJR measure
| Not published for private hospitals | Not covered by NHS patient surveys | Good (CQC report for Nuffield Health Wessex Hospital) |
| Nuffield Health Woking HospitalPrivate hospitalPrivate hospital: NJR figures include privately funded and NHS-funded operations. | 400 to 749485 joint replacements of all kinds recorded in 2025Earlier years: 2023: 332, 2024: 435 | Not identified as an outlierEach NJR measure
| Not published for private hospitals | Not covered by NHS patient surveys | Good (CQC report for Nuffield Health Woking Hospital) |
| Nuffield Orthopaedic CentreNHS · Oxford University Hospitals NHS Foundation Trust | 1,000 or more2,072 joint replacements of all kinds recorded in 2025Earlier years: 2023: 1,343, 2024: 1,846 | Identified as an outlier: hip 10-year revisionMore measures
| 15.1 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 57.4% waiting under 18 weeks (August 2026) | About the same as other trustsInpatients rated their overall experience 8.2 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | Good (CQC report for Nuffield Orthopaedic Centre) |
| Practice Plus Group Hospital, SouthamptonPrivate hospitalPrivate hospital: NJR figures include privately funded and NHS-funded operations. | 750 to 999979 joint replacements of all kinds recorded in 2025Earlier years: 2023: 898, 2024: 1,102 | Identified as an outlier: hip 5-year revision; hip 10-year revisionEach NJR measure
| Not published for private hospitals | Not covered by NHS patient surveys | Good (CQC report for Practice Plus Group Hospital, Southampton) |
| The Princess Margaret HospitalPrivate hospitalPrivate hospital: NJR figures include privately funded and NHS-funded operations. | 400 to 749490 joint replacements of all kinds recorded in 2025Earlier years: 2023: 432, 2024: 503 | Not identified as an outlierEach NJR measure
| Not published for private hospitals | Not covered by NHS patient surveys | Good (CQC report for The Princess Margaret Hospital) |
| Princess Royal HospitalNHS · University Hospitals Sussex NHS Foundation Trust | 400 to 749437 joint replacements of all kinds recorded in 2025Earlier years: 2023: 371, 2024: 467 | Identified as an outlier: hip 5-year revisionMore measures
| 18.8 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 48.4% waiting under 18 weeks (August 2026) | About the same as other trustsInpatients rated their overall experience 8.4 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | Requires improvement (CQC report for Princess Royal Hospital) |
| Queen Alexandra HospitalNHS · Portsmouth Hospitals University NHS Trust | 1,000 or more1,930 joint replacements of all kinds recorded in 2025Earlier years: 2023: 1,163, 2024: 1,949 | Not identified as an outlierMore measures
| 18.4 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 49.1% waiting under 18 weeks (August 2026) | About the same as other trustsInpatients rated their overall experience 8 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | Good (CQC report for Queen Alexandra Hospital) |
| Queen Elizabeth The Queen Mother HospitalNHS · East Kent Hospitals University NHS Foundation Trust | 400 to 749409 joint replacements of all kinds recorded in 2025Earlier years: 2023: 326, 2024: 438 | Not identified as an outlierMore measures
| 20.7 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 44% waiting under 18 weeks (August 2026) | About the same as other trustsInpatients rated their overall experience 8.3 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | Requires improvement (CQC report for Queen Elizabeth The Queen Mother Hospital) |
| Royal Berkshire HospitalNHS · Royal Berkshire NHS Foundation Trust | 1,000 or more1,137 joint replacements of all kinds recorded in 2025Earlier years: 2023: 904, 2024: 1,161 | Not identified as an outlierMore measures
| 10 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 82.9% waiting under 18 weeks (August 2026) | About the same as other trustsInpatients rated their overall experience 8.3 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | Good (CQC report for Royal Berkshire Hospital) |
| Royal Hampshire County HospitalNHS · Hampshire Hospitals NHS Foundation Trust | 400 to 749697 joint replacements of all kinds recorded in 2025Earlier years: 2023: 961, 2024: 886 | Not identified as an outlierMore measures
| 14.2 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 60.7% waiting under 18 weeks (August 2026) | About the same as other trustsInpatients rated their overall experience 8.3 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | Good (CQC report for Royal Hampshire County Hospital) |
| Royal Surrey County HospitalNHS · Royal Surrey NHS Foundation Trust | 400 to 749733 joint replacements of all kinds recorded in 2025Earlier years: 2023: 759, 2024: 796 | Not identified as an outlierMore measures
| 13.4 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 62.7% waiting under 18 weeks (August 2026) | About the same as other trustsInpatients rated their overall experience 8.5 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | Outstanding (CQC report for Royal Surrey County Hospital) |
| Royal Sussex County HospitalNHS · University Hospitals Sussex NHS Foundation Trust | Fewer than 400100 joint replacements of all kinds recorded in 2025Earlier years: 2023: 47, 2024: 69 | Not identified as an outlierMore measures
| 18.8 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 48.4% waiting under 18 weeks (August 2026) | About the same as other trustsInpatients rated their overall experience 8.4 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | Requires improvement (CQC report for Royal Sussex County Hospital) |
| The Runnymede HospitalPrivate hospitalPrivate hospital: NJR figures include privately funded and NHS-funded operations. | Fewer than 400342 joint replacements of all kinds recorded in 2025Earlier years: 2023: 266, 2024: 334 | Not identified as an outlierEach NJR measure
| Not published for private hospitals | Not covered by NHS patient surveys | Good (CQC report for The Runnymede Hospital) |
| Sarum Road HospitalPrivate hospitalPrivate hospital: NJR figures include privately funded and NHS-funded operations. | 400 to 749565 joint replacements of all kinds recorded in 2025Earlier years: 2023: 514, 2024: 618 | Not identified as an outlierEach NJR measure
| Not published for private hospitals | Not covered by NHS patient surveys | Good (CQC report for Sarum Road Hospital) |
| The Saxon ClinicPrivate hospitalPrivate hospital: NJR figures include privately funded and NHS-funded operations. | 400 to 749593 joint replacements of all kinds recorded in 2025Earlier years: 2023: 489, 2024: 606 | Not identified as an outlierEach NJR measure
| Not published for private hospitals | Not covered by NHS patient surveys | Good (CQC report for The Saxon Clinic) |
| Southampton General HospitalNHS · University Hospital Southampton NHS Foundation Trust | 1,000 or more1,220 joint replacements of all kinds recorded in 2025Earlier years: 2023: 927, 2024: 1,172 | Identified as an outlier: hip 10-year revisionMore measures
| 17.8 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 50.6% waiting under 18 weeks (August 2026) | About the same as other trustsInpatients rated their overall experience 8.3 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | Good (CQC report for Southampton General Hospital) |
| Spencer Private HospitalPrivate hospitalPrivate hospital: NJR figures include privately funded and NHS-funded operations. | 400 to 749409 joint replacements of all kinds recorded in 2025Earlier years: 2023: 351, 2024: 358 | Not identified as an outlierEach NJR measure
| Not published for private hospitals | Not covered by NHS patient surveys | Good (CQC report for Spencer Private Hospital) |
| Spire Alexandra HospitalPrivate hospitalPrivate hospital: NJR figures include privately funded and NHS-funded operations. | 400 to 749629 joint replacements of all kinds recorded in 2025Earlier years: 2023: 753, 2024: 596 | Not identified as an outlierEach NJR measure
| Not published for private hospitals | Not covered by NHS patient surveys | Requires improvement (CQC report for Spire Alexandra Hospital) |
| Spire Clare Park HospitalPrivate hospitalPrivate hospital: NJR figures include privately funded and NHS-funded operations. | 400 to 749461 joint replacements of all kinds recorded in 2025Earlier years: 2023: 420, 2024: 439 | Not identified as an outlierEach NJR measure
| Not published for private hospitals | Not covered by NHS patient surveys | Good (CQC report for Spire Clare Park Hospital) |
| Spire Dunedin HospitalPrivate hospitalPrivate hospital: NJR figures include privately funded and NHS-funded operations. | Fewer than 400337 joint replacements of all kinds recorded in 2025Earlier years: 2023: 205, 2024: 272 | Not identified as an outlierEach NJR measure
| Not published for private hospitals | Not covered by NHS patient surveys | Good (CQC report for Spire Dunedin Hospital) |
| Spire Gatwick Park HospitalPrivate hospitalPrivate hospital: NJR figures include privately funded and NHS-funded operations. | 400 to 749688 joint replacements of all kinds recorded in 2025Earlier years: 2023: 652, 2024: 701 | Not identified as an outlierEach NJR measure
| Not published for private hospitals | Not covered by NHS patient surveys | Good (CQC report for Spire Gatwick Park Hospital) |
| Spire Portsmouth HospitalPrivate hospitalPrivate hospital: NJR figures include privately funded and NHS-funded operations. | 750 to 999918 joint replacements of all kinds recorded in 2025Earlier years: 2023: 684, 2024: 775 | Not identified as an outlierEach NJR measure
| Not published for private hospitals | Not covered by NHS patient surveys | Good (CQC report for Spire Portsmouth Hospital) |
| Spire Southampton HospitalPrivate hospitalPrivate hospital: NJR figures include privately funded and NHS-funded operations. | 1,000 or more1,331 joint replacements of all kinds recorded in 2025Earlier years: 2023: 1,431, 2024: 1,360 | Not identified as an outlierEach NJR measure
| Not published for private hospitals | Not covered by NHS patient surveys | Good (CQC report for Spire Southampton Hospital) |
| Spire Thames Valley HospitalPrivate hospitalPrivate hospital: NJR figures include privately funded and NHS-funded operations. | 400 to 749401 joint replacements of all kinds recorded in 2025Earlier years: 2023: 221, 2024: 282 | Not identified as an outlierEach NJR measure
| Not published for private hospitals | Not covered by NHS patient surveys | Good (CQC report for Spire Thames Valley Hospital) |
| St Mary's HospitalNHS · Isle of Wight NHS Trust | 400 to 749642 joint replacements of all kinds recorded in 2025 | Identified as an outlier: hip 10-year revisionMore measures
| 16.9 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 52.2% waiting under 18 weeks (August 2026) | About the same as other trustsInpatients rated their overall experience 7.9 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | Requires improvement (CQC report for St Mary's Hospital) |
| St Peter's HospitalNHS · Ashford and St. Peter's Hospitals NHS Foundation Trust | Fewer than 400269 joint replacements of all kinds recorded in 2025Earlier years: 2023: 99, 2024: 91 | Not identified as an outlierMore measures
| 12.6 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 66.5% waiting under 18 weeks (August 2026) | About the same as other trustsInpatients rated their overall experience 8.2 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | Requires improvement (CQC report for St Peter's Hospital) |
| St Richard's HospitalNHS · University Hospitals Sussex NHS Foundation Trust | 1,000 or more1,266 joint replacements of all kinds recorded in 2025Earlier years: 2023: 833, 2024: 1,194 | Not identified as an outlierMore measures
| 18.8 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 48.4% waiting under 18 weeks (August 2026) | About the same as other trustsInpatients rated their overall experience 8.4 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | Requires improvement (CQC report for St Richard's Hospital) |
| Stoke Mandeville HospitalNHS · Buckinghamshire Healthcare NHS Trust | Fewer than 40095 joint replacements of all kinds recorded in 2025Earlier years: 2023: 73, 2024: 120 | Not identified as an outlierMore measures
| 16 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 56.1% waiting under 18 weeks (August 2026) | Somewhat worse than expectedInpatients rated their overall experience 7.8 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | Good (CQC report for Stoke Mandeville Hospital) |
| The Tunbridge Wells Hospital at PemburyNHS · Maidstone and Tunbridge Wells NHS Trust | 400 to 749629 joint replacements of all kinds recorded in 2025Earlier years: 2023: 520, 2024: 701 | Not identified as an outlierMore measures
| 10.8 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 75.6% waiting under 18 weeks (August 2026) | About the same as other trustsInpatients rated their overall experience 8.1 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | Requires improvement (CQC report for The Tunbridge Wells Hospital at Pembury) |
| Wexham Park HospitalNHS · Frimley Health NHS Foundation Trust | 400 to 749417 joint replacements of all kinds recorded in 2025Earlier years: 2023: 288, 2024: 314 | Not identified as an outlierMore measures
| 16.4 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 53.7% waiting under 18 weeks (August 2026) | About the same as other trustsInpatients rated their overall experience 8.3 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | Outstanding (CQC report for Wexham Park Hospital) |
| William Harvey HospitalNHS · East Kent Hospitals University NHS Foundation Trust | Fewer than 400327 joint replacements of all kinds recorded in 2025Earlier years: 2023: 217, 2024: 325 | Not identified as an outlierMore measures
| 20.7 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 44% waiting under 18 weeks (August 2026) | About the same as other trustsInpatients rated their overall experience 8.3 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | Requires improvement (CQC report for William Harvey Hospital) |
| Worthing HospitalNHS · University Hospitals Sussex NHS Foundation Trust | Fewer than 400316 joint replacements of all kinds recorded in 2025Earlier years: 2023: 155, 2024: 299 | Not identified as an outlierMore measures
| 18.8 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 48.4% waiting under 18 weeks (August 2026) | About the same as other trustsInpatients rated their overall experience 8.4 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | Requires improvement (CQC report for Worthing Hospital) |
| Wycombe HospitalNHS · Buckinghamshire Healthcare NHS Trust | 400 to 749663 joint replacements of all kinds recorded in 2025Earlier years: 2023: 521, 2024: 689 | Not identified as an outlierMore measures
| 16 weeksHalf of people waiting for trauma and orthopaedics had waited less than this. 56.1% waiting under 18 weeks (August 2026) | Somewhat worse than expectedInpatients rated their overall experience 7.8 out of 10 (CQC Adult Inpatient Survey 2025, whole trust) | Good (CQC report for Wycombe Hospital) |
Across England
In 2025-26, NHS-funded care in England (NHS hospitals and NHS patients treated by independent providers; private patients are not included) recorded 63,535 episodes where the main procedure was total hip replacement (OPCS-4 W37 to W39). 2% were day cases. Half of the people admitted from a waiting list had waited less than about 118 days from the decision to admit them. These are national figures from Hospital Episode Statistics (NHS England, 2025-26, Open Government Licence v3.0); the same detail is not published for each hospital.
Hospitals identified as outliers across the UK in the NJR 2025 file (out of 403): Hip 90-day mortality: 0; Hip 5-year revision: 11; Hip 10-year revision: 26.
How to read this
- Not a ranking. The table is in alphabetical order. A higher volume does not on its own mean better care, and we do not combine the columns into a score.
- Volume bands. Cut points are the lower quartile, median and upper quartile of all 398 hospitals that reported to the NJR in 2025 in the published table, rounded. So about a quarter of hospitals that reported to the NJR in 2025 fall in each band. The exact number is shown under the band.
- Risk adjustment. Where a figure says “adjusted”, the audit has allowed for differences in the patients each hospital treats, such as age and other illnesses. Hospitals that take on more complex cases can still look different for reasons the adjustment does not capture.
- Bands and limits. We only say a result is higher or lower than expected when the source itself says so (for example NJR outlier status, NELA funnel limits, SSNAP levels, CQC survey bands). Where the source publishes a rate without limits we show the rate and the national figure, and say “No banding published”.
- Small numbers. A small hospital can have 0% or a high percentage by chance. Figures the source suppresses are shown as “Not published (small numbers)”.
- Trust or hospital. Volumes and outcomes here are for each hospital or team, but waiting times and the CQC inpatient survey are for the whole trust.
- Different periods. Each figure has its own period, shown next to it. Audit results describe operations done one to three years ago; waiting times are updated monthly.
- Private hospitals. NHS waiting times and NHS patient surveys do not cover private hospitals. Private hospital data published by PHIN cannot be republished here without a licence.
- Talk to your GP or consultant about what the figures mean for you. If you are referred for planned care in England, you can usually choose your hospital.
Full definitions: methodology and data dictionary.
Data sources and licences
- National Joint Registry (NJR) transparency data, National Joint Registry / HQIP. Source: National Joint Registry (NJR) transparency data, via data.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. Open Government Licence v3.0
- Consultant-led Referral to Treatment Waiting Times, NHS England. Source: NHS England, Referral to Treatment waiting times. Contains public sector information licensed under the Open Government Licence v3.0. Open Government Licence v3.0
- CQC Adult Inpatient Survey 2025 (trust benchmark results), Care Quality Commission. Source: Care Quality Commission, NHS Patient Survey Programme, Adult Inpatient Survey 2025. Contains public sector information licensed under the Open Government Licence v3.0. Open Government Licence v3.0
- CQC ratings, Care Quality Commission. CQC ratings: Care Quality Commission. Contains public sector information licensed under the Open Government Licence v3.0. Open Government Licence v3.0
- Healthcare-associated infections: annual counts and rates by trust (financial year 2025 to 2026), UK Health Security Agency. Source: UK Health Security Agency, healthcare-associated infection annual data. Contains public sector information licensed under the Open Government Licence v3.0. Open Government Licence v3.0
Data last updated 26 October 2026. We do not change the published figures; we only group volumes into bands. Spotted a mistake? Tell us.
Sources
We checked this guide against these official pages on 26 October 2026.
- Hip replacement: what is a hip replacement? (NHS website)
- Hip replacement (NHS website)
- National Joint Registry transparency data (data.gov.uk) (National Joint Registry)
- Hospital Admitted Patient Care Activity 2025-26 (NHS England)
- Consultant-led Referral to Treatment Waiting Times 2026-27 (NHS England)
- Adult inpatient survey (Care Quality Commission)
Spotted something out of date? Tell us.